A manufacturing process for a chain tool attached to a bicycle folding tool included the following steps: Material preparing step: a rod with a length is prepared. To this end, a comparison is made between the ejected volume of easily sedimenting inks and the ejected volume of sedimentation restraining inks in terms of ink components. In some aspects, the distributed SIB decoding scheme includes a partitioned SIB decoding schedule for the maximum repetition rate duration and based at least in part on a continuous SIB decoding period. When the sleeved stone section needs to be replaced, the threaded stone retaining shaft is simply unthreaded to expose the stone for removal and replacement.