1459885894-161ac8f1-57ef-48e6-9b7f-ffea155951cc

A timing estimation system and methodology are provided. A gate control region of the first conductivity type adjoins the channel region at a second side of the channel region opposed to the first side, the channel region being configured to be controlled in its conductivity by voltage application between the gate control region and the body region. A control signal selects a band of frequencies for processing.