1459985480-a888a9d3-c9ea-4b65-bce7-efbda9febfef

A pill for wellbore operations, that includes a base fluid; and at least two polymers that interact to form a gelatinous structure characterized as isolating and controllably transmitting hydrostatic pressure between a first wellbore fluid above the pill in a wellbore and a second wellbore fluid below the pill in the wellbore is disclosed. Multipoint Control Unit creates an indicator containing multi-picture information for each of the terminals and sends the indicators to the terminals; B. A time stamp in the trace data is placed in response to a determination that the new trace event did not occur at the expected period of time, wherein time stamps occurring at the expected period if time are eliminated from the trace data and wherein compression of the trace data occurs.