An electrical load controller that controls the starting sequence for a plurality of electrical loads includes a start demanding unit that generates a demand to start at least one of the plurality of electrical loads. These links may be from a short-range wireless communications network. VMs of an ordered list are sequentially checked for data cache hit corresponding to the data in an order given by a ranking. One of the user authorization lists and one of the preference lists are selected based on the identification information received.