1461136066-ccbd5663-0d00-4773-b08c-c84b07effff3

A system and method for increasing hydrocarbon production from a subsurface reservoir andor sequestering waste material such as carbon dioxide by utilizing a connection between two well bores and a flexible linear cutting device, such as a segmented diamond wire saw, to form a fissure beginning at the connection of the well bores and extending along a specified the length of the well bores. The reheated steam is supplied to the IP section inlet of the steam turbine. Further, the mesh devices are enable to communicate during the contention-free period.