An operating method for container quay cranes used to load and unload container ships aided by a PC with a monitor in a crane driver’s cabin. The eccentric shaft may be a drum shaft with a mass welded to its surface. The grounding element provides an electrical pathway to ground electromagnetic emissions incident upon the EMI shield. An engine oil change detection module detects an engine oil change event based on the delay time.